SERVICE

Bulk / Liquid Cargo Charter

3 deadweight tonnage and above small bulk carriers with available schedules; export of bulk cargo such as steel, construction minerals, and chemicals via full or consolidated vessel charters. Liquid tankers chartering and route load planning services.

Bulk carrier deck and liquid cargo piping docked at port

OVERVIEW

How should this shipment be routed? Let's clarify the conditions first.

For bulk cargo, success hinges on matching vessel schedules with available capacity. Based on cargo volume, port conditions, and operational efficiency, we recommend full-ship or consolidated shipments. We also clarify loading/unloading terms, demurrage/dispatch fees, and stowage plans before contract signing.

Steel and BilletsMining construction materialsChemicalGrainsLiquid Cargo and Vegetable Oil

Documents required from the customer

  • Packing List and Physical-Chemical Indicators
  • Loading and Discharging Port & Berth Information
  • Confirm Charter Party Terms
  • Customs Declaration and Inspection Documents

PROCESS

Workflow

  1. 01

    Cargo Volume and Port of Loading/Discharge Confirmation

    Confirm cargo volume, packaging type, and loading/unloading port conditions.

  2. 02

    Vessel Schedule Matching and Charter Party Terms

    Match available vessel schedules; clarify loading/unloading rates, demurrage/dispatch fees, and allocation methods.

  3. 03

    Stowage and Loading Plan

    Provide stowage plans, dunnage, and separation schemes to minimize cargo mixing and damage.

  4. 04

    Port Loading Operations and Documentation

    Bridge the gap between port operations and cargo surveying by verifying bills of lading, draft surveys, and inspection reports.

  5. 05

    Port discharge handover and settlement

    Track discharge operations and handover; verify demurrage and settle charges.

Coverage

QingdaoRizhaoTianjinLianyungangShanghaiNingboGuangzhou

CASES

Work Site

Organize operations by cargo type and site conditions, from port arrival and lifting to loading/unloading and delivery.

Gantry crane unloads bagged bulk cargo from the hold.

Grab unloading operation

After the bulk carrier docks, grab unloading is performed with material type-specific control of grab capacity and drop points.

Stow white bagged cargo and black steel coils in separate zones inside the hold.

Bagged and Coil Cargo in Hold

Palletize bagged goods and store steel coils horizontally in designated zones, with padding to prevent crushing.

Nighttime container stowage of bagged cargo

Nighttime Cabin Unloading

During night shifts, continuous operations maintain synchronized cabin lighting and command signals.

Nighttime Grab Unloading Operation Site

Nighttime Grab Unloading

Coordinate grabber operations with onshore vehicles to minimize vessel turnaround time.

Above: Real photos from the enterprise site. Specific project details are subject to business discussions.

FAQ

FAQ

For any details not covered, please send us the product information directly.

Inquire about this business

Based on my shipment, provide a quote.

Provide product name, package weight and dimensions, and ports of loading/discharge. We will reply with the cost breakdown within 24 hours.

Get a Quote