SERVICE

Custom Project Logistics

Comprehensive solution for plant relocation and heavy petrochemical/papermaking equipment transport, covering route survey, reinforcement, customs clearance, and full-service tracking to installation at the destination port.

Heavy-axle transporter moves oversized pressure vessels

OVERVIEW

How should this shipment be routed? Let's clarify the conditions first.

The delivery standard for project logistics isn't "delivered to port"—it's that equipment must be fully reassembled and ready at the destination site. We create a unified schedule covering disassembly, packaging, lifting, transportation, and installation milestones, defining clear responsibility boundaries for each phase.

Complete production line relocationPetrochemical and Papermaking EquipmentOversized and overweight single itemOverseas Factory Construction Project

Documents required from the customer

  • Equipment List and Weight Center of Gravity
  • Packaging and Lifting Technical Requirements
  • Project Milestone Plan
  • Export Customs Declaration and Destination Country Requirements

PROCESS

Workflow

  1. 01

    Site Inspection and Transport Feasibility

    Survey the route, measure clearance, and confirm lifting and transport conditions.

  2. 02

    Unpacking and Lifting Plan

    Define the disassembly sequence, packaging grade, and lifting point plan.

  3. 03

    Multi-leg Transport and Transshipment

    Schedule axle trucks, barges, or roll-on/roll-off vessels to connect transshipment nodes.

  4. 04

    Customs clearance and overseas segment integration

    Prepare shipping documents and coordinate with the destination port agent and local carrier.

  5. 05

    On-site Delivery and Installation Support

    Deliver to the site as scheduled and support installation and commissioning milestones.

Coverage

QingdaoYantaiRizhaoTianjinShanghaiNantongChangshuZhangjiagang

CASES

Work Site

Organize operations by cargo type and site conditions, from port arrival and lifting to loading/unloading and delivery.

Segregation of steel coils and passenger vehicles in the hold

Mixed loading of complete vehicles and steel coils

Separate passenger vehicles and steel coils during loading; maintain inspection aisles once vehicle positions are fixed.

Ro-ro crane loading a bus onto the vessel

Bus Loading onto Vessel

Use specialized lifting fixtures for full-vehicle hoisting to control lift point positions and ensure levelness.

Evening: Yard zone covering equipment and concrete mixer trucks at the dock

Project cargo at port, awaiting loading

Multi-category equipment stored centrally, arranged in zones according to loading sequence.

Above: Real photos from the enterprise site. Specific project details are subject to business discussions.

FAQ

FAQ

For any details not covered, please send us the product information directly.

Inquire about this business

Based on my shipment, provide a quote.

Provide product name, package weight and dimensions, and ports of loading/discharge. We will reply with the cost breakdown within 24 hours.

Get a Quote
Lu ICP Prep 2024055459 No. -1