SERVICE
Custom Project Logistics
Comprehensive solution for plant relocation and heavy petrochemical/papermaking equipment transport, covering route survey, reinforcement, customs clearance, and full-service tracking to installation at the destination port.

OVERVIEW
How should this shipment be routed? Let's clarify the conditions first.
The delivery standard for project logistics isn't "delivered to port"—it's that equipment must be fully reassembled and ready at the destination site. We create a unified schedule covering disassembly, packaging, lifting, transportation, and installation milestones, defining clear responsibility boundaries for each phase.
Documents required from the customer
- Equipment List and Weight Center of Gravity
- Packaging and Lifting Technical Requirements
- Project Milestone Plan
- Export Customs Declaration and Destination Country Requirements
PROCESS
Workflow
- 01
Site Inspection and Transport Feasibility
Survey the route, measure clearance, and confirm lifting and transport conditions.
- 02
Unpacking and Lifting Plan
Define the disassembly sequence, packaging grade, and lifting point plan.
- 03
Multi-leg Transport and Transshipment
Schedule axle trucks, barges, or roll-on/roll-off vessels to connect transshipment nodes.
- 04
Customs clearance and overseas segment integration
Prepare shipping documents and coordinate with the destination port agent and local carrier.
- 05
On-site Delivery and Installation Support
Deliver to the site as scheduled and support installation and commissioning milestones.
Coverage
CASES
Work Site
Organize operations by cargo type and site conditions, from port arrival and lifting to loading/unloading and delivery.

Mixed loading of complete vehicles and steel coils
Separate passenger vehicles and steel coils during loading; maintain inspection aisles once vehicle positions are fixed.

Bus Loading onto Vessel
Use specialized lifting fixtures for full-vehicle hoisting to control lift point positions and ensure levelness.

Project cargo at port, awaiting loading
Multi-category equipment stored centrally, arranged in zones according to loading sequence.
Above: Real photos from the enterprise site. Specific project details are subject to business discussions.
FAQ
FAQ
For any details not covered, please send us the product information directly.
Inquire about this businessBased on my shipment, provide a quote.
Provide product name, package weight and dimensions, and ports of loading/discharge. We will reply with the cost breakdown within 24 hours.
